Skip to content

Energy market · Funding

Funding for battery storage and commercial PV

For batteries and solar PV in businesses there are subsidised loans, state grants and tax depreciation. Which of them fit depends on location, company size and sector. Listed here are the programmes that, according to our review, are currently open to commercial and industrial businesses.

As of 14 October 2026. Funding programmes change often; only the conditions set by the funding body on the day of your application are decisive.

Apply first, then place the order

Almost all programmes require the application to have been submitted – and for grants usually also the funding body’s acknowledgement of receipt – before you sign a supply or service contract, place an order or make a down payment. Ordering too early can rule out funding.

Load profile analysis, design and quotation are not affected. You can review everything at your own pace and place the order only after applying; we align quotation and order with your funding application.

Nationwide

  • KfW

    KfW programme 270 “Renewable Energies – Standard” (subsidised loan)

    What for
    PV systems and battery storage, including a stand-alone battery or a retrofit, plus metering and control equipment.
    Who for
    Companies of any size.
    What to watch
    Loan via your house bank or savings bank. The application must be submitted before you sign a supply or service contract.
    Go to the funding body
  • BAFA

    Industrial electricity price relief

    What for
    Electricity price relief for energy-intensive sectors in 2026 to 2028. At least half of the relief must be invested in decarbonisation; a battery against load peaks or a new PV system can count towards this.
    Who for
    Only consumption points in the sectors on the EU list (CEEAG, sub-list 1), such as steel, aluminium, copper, foundries, chemicals, paper and glass. The classification under the German WZ 2008 sector codes is decisive; according to our review, the recovery of sorted materials (WZ 38.32) is not on the list.
    What to watch
    No other state aid may flow to the measure counted, and a PV system may not receive EEG feed-in support. The measure only counts from the start of the respective settlement year.
    Go to the funding body
  • Income and corporation tax

    Depreciation

    What for
    For movable assets acquired between 1 July 2025 and 31 December 2027, declining-balance depreciation is available again (Section 7(2) of the German Income Tax Act, EStG). Smaller businesses can additionally use the investment deduction and special depreciation under Section 7g EStG.
    Who for
    Tax-liable businesses; Section 7g EStG only up to a profit threshold.
    What to watch
    Whether and how the battery and PV system are depreciated in your business is a matter for your tax adviser.
    Go to the funding body
  • BAFA

    Energy and resource efficiency in business

    What for
    Grant for efficiency and electrification projects. A battery can be co-funded as an ancillary cost if it increases the share of self-generated power; the PV system itself is excluded.
    Who for
    Companies; depending on the module, only SMEs or all sizes.
    What to watch
    Not a programme for a battery on its own: it has to be part of a measure with proven CO₂ savings, such as converting a process to electricity. Apply before the project starts.
    Go to the funding body

In our service areas

  • IBB Business Team

    Berlin: SolarPLUS L

    What for
    Grant for battery storage and energy management together with a new PV system, as well as for metering points and expert reports.
    Who for
    Owners and authorised users of commercial and industrial buildings, companies of any size.
    What to watch
    IBB’s acknowledgement of receipt must be in hand before you order, commission or make a down payment. The scheme runs until 31 December 2026.
    Go to the funding body
  • LFI M-V (state funding institute)

    Mecklenburg-Western Pomerania: climate protection funding for businesses

    What for
    Grant for climate protection projects in companies, explicitly including battery storage.
    Who for
    Companies with projects in Mecklenburg-Western Pomerania.
    What to watch
    The project must reduce greenhouse gas emissions by at least 30 percent compared with before. Apply before any supply or service contract; work only starts after the acknowledgement of receipt.
    Go to the funding body
  • NBank

    Lower Saxony: Niedersachsen Invest EFRE

    What for
    A PV system mainly for own use and a battery for the PV system as an add-on to a business expansion.
    Who for
    Small and medium-sized enterprises only.
    What to watch
    Only together with an investment that creates jobs and raises the level of innovation or digitalisation of your business. NBank must confirm before the start.
    Go to the funding body
  • ILB

    Brandenburg: Renewable Energies Brandenburg 2025

    What for
    PV systems over car parks with battery storage and charging points; rooftop systems are not part of the programme.
    Who for
    Small and medium-sized enterprises with a site in Brandenburg.
    What to watch
    Car parks that fall under the solar obligation of the building code are excluded. Battery funding in Brandenburg’s storage programme is currently suspended.
    Go to the funding body

For North Rhine-Westphalia and Bremen we have not been able to confirm an open state programme for commercial batteries or rooftop PV as of this page; in North Rhine-Westphalia the grants for carport and facade PV are currently suspended. The KfW loan applies nationwide.

How we support your application

  1. 01

    Analyse the data

    Load profile, electricity bill and roof: from these, design and costs. This does not affect the funding.

  2. 02

    Prepare the quotation

    Items split into battery, energy management and PV, as funding bodies and banks need them.

  3. 03

    You apply

    With your house bank or the funding body, with your tax or funding adviser if you wish. We supply the technical details.

  4. 04

    Then place the order

    Only once the application has been submitted and, where required, the acknowledgement of receipt is in hand.

Please note

This overview is not legal, tax or funding advice. Whether and to what extent a project is funded is decided solely by the funding body; as a rule there is no legal entitlement. You submit applications yourself or through your bank. As of 14 October 2026.

Book a call – we will check your eligibility for funding.