On-premise AI data centre for mid-sized companies, powered from your own site

A data centre on your own premises keeps AI and data inside your business. We build the energy side: PV on the factory roof, battery storage and the grid connection, including the application to the network operator. We connect the data centre container electrically and coordinate all trades through to commissioning. You have one point of contact.

What a site looks like

Grid12345
  1. 1PV system on the factory roof
  2. 2Grid connection, with its own transformer substation depending on capacity
  3. 3Data centre container with cooling
  4. 4Battery storage
  5. 5Underground cable routes, connection to the grid
Schematic, not to scale. Layout, voltage level and metering concept are agreed for each site with the network operator and the design engineers.

What belongs together

  • Data sovereignty

    AI models, analyses and company data run on your own hardware, on your own site. You decide which data leaves the business.

  • PV on the factory roof

    We cover the roof as far as the structure and the grid connection allow. A data centre consumes power around the clock, so almost all of the rooftop solar power is used on site.

  • Battery storage

    Shifts the midday surplus into the evening and night, caps load peaks at the grid connection and supports the supply. It only replaces a UPS if it is designed for that purpose.

  • Modular container data centre

    Delivered fully wired and installed next to the hall, from around 60 kW of IT load as an example size, and expandable. Modular container data centres and GPU servers from leading manufacturers; we are manufacturer-neutral.

  • Grid connection and application

    Connection request, capacity increase or a dedicated medium-voltage connection with transformer substation, metering concept and application to the network operator.

  • Secure AI agents on your own hardware – with NVIDIA OpenShell

    Based on NVIDIA GPU hardware, we set up AI agents in an isolated runtime environment with a multi-layered security concept. The models run locally; your data does not leave the business.

  • One point of contact

    We coordinate the network operator, design engineers, civil works, electrical, cooling and IT partners through to commissioning, with fixed test steps and complete documentation.

Delivered, connected, up and running

A modular data centre is up and running quickly, provided the site is prepared. That is the real advantage of the container solution.

  • Delivered ready to run

    The data centre container arrives fully wired and factory-tested. On site, it is set up, connected and switched on. In practice, that means days of site work instead of months.

  • The catch: the site has to be ready

    This only works if the grid connection, transformer, foundation, cable routes and energy are in place. That is exactly what we do beforehand. Then the container does not sit waiting for power.

  • Your money works from day one

    In practice, hardware that has been paid for but is not computing ties up capital without any benefit. If the connection and energy are in place before the container arrives, the investment works from the first day.

This principle is catching on. On 21 October 2026 at GTC Berlin, NVIDIA introduced DSX POD, its own reference design for data centres built from prefabricated containers: compute, cabling, rack-level power and liquid cooling are installed and tested in the factory. According to NVIDIA, this reduces deployment time at a prepared site from six months to as little as 14 days, with deliveries planned from early 2027. According to NVIDIA, this too still requires a prepared site with connections to power, cooling and networking. DSX POD initially targets large, newly built AI data centres; modular container data centres are also available in smaller sizes from various manufacturers.

Source: NVIDIA, press release on DSX POD (21 Oct 2026), DSX POD product page.

Why the grid connection sets the timeline

How an on-prem project runs

This is how it works in practice. The order is deliberate: the power comes first, then the hardware is ordered.

  1. 01

    Requirements and site check

    Which AI applications, how much computing power, which expansion stages? We check the site, installation area, roof areas, service connection and schedule.

  2. 02

    Energy concept

    PV, battery storage, grid connection and UPS for your site: capacity, voltage level, metering concept and what still has to come from the grid.

  3. 03

    Container and servers

    You can buy or lease the data centre container and GPU servers directly from the manufacturer; leasing or financing is often possible through the hardware manufacturers’ own financing offers. We are happy to discuss how we set up procurement for your project.

  4. 04

    Power, connection, integration

    We build PV, storage and the grid connection, coordinate foundations and cable routes and connect the container electrically: supply, distribution, UPS and metering.

  5. 05

    IT commissioning

    Specialist partners or your own team commission the IT, up to the connection to existing systems such as your ERP. We coordinate dates and interfaces.

  6. 06

    AI setup with NVIDIA OpenShell

    We set up the isolated runtime environment for your AI agents: sandbox and policies per agent, local models and the connection to approved systems.

  7. 07

    Operation and maintenance

    Maintenance and periodic testing of PV, storage and electrical installation, monitoring in the customer portal. Your IT service provider or your team looks after the IT.

Why it works now – and why it is secure

Why now: Capable AI models are now available as open models, for example NVIDIA Nemotron. They run on your own hardware, on your premises, without the cloud. And there is now ready-made, freely available software that isolates AI agents: NVIDIA OpenShell (open source). Until recently, you had to build something like this yourself.

Why secure: An AI agent works like a new employee with a visitor badge: it only gets into the rooms you unlock, it is never handed the keys, and every new door has to be approved by someone first. According to NVIDIA, OpenShell enforces the rules outside the agent, so the agent cannot switch them off:

  • Its own room – each agent works in its own isolated environment (sandbox) and can only reach the files released to it.
  • Approved connections only – the agent can only connect to destinations you have approved; everything else is blocked.
  • No real passwords – the agent never sees real credentials; OpenShell inserts them outside the agent, and only for approved destinations.
  • New rights only with approval – if the agent needs more, by default a person reviews the request; the agent cannot approve it itself, and every decision is logged.

That is “Your own AI. Your own energy.”: your data stays in-house, and as much of the power as possible comes from your own roof.

Source: NVIDIA, OpenShell, OpenShell documentation, technical blog on OpenShell, Nemotron. StromWert is not a partner of NVIDIA.

Secure AI agents on your own hardware – with NVIDIA OpenShell

Based on NVIDIA GPU hardware, we set up AI agents in an isolated runtime environment. For this we use NVIDIA OpenShell: open source (Apache 2.0), with a stable release cadence since version 0.1 and usable with any agent. We work out with you which agent suits your task.

Multi-layered security concept, from the outside in
  1. Your own site

    The hardware stands on your premises and runs on electricity from your own PV and battery. Your data does not leave the business.

    1. Local models

      The AI runs on your own GPU servers. No cloud AI is needed.

      1. Isolated sandbox per agent

        Kernel-level controls limit which files and system functions an agent can access. It runs without administrator rights.

        1. Network policies

          Every outbound connection is checked before it leaves the sandbox. Only approved destinations can be reached; everything else is denied.

          1. Credential protection

            Agents never see real passwords or keys. These are only added to requests to approved destinations.

            1. Controlled changes

              OpenShell automatically checks new permissions using formal verification before they are approved. Changes with findings are not approved automatically; they wait for a human to approve them.

              1. Connection to your systems

                An agent reaches SAP, ServiceNow or Salesforce (Agentforce) only through approved interfaces.

                AI agent

Note: each layer limits, in a traceable way, what an agent can do. The concept complements your IT security concept; it does not replace it. StromWert is not a partner of NVIDIA, SAP, ServiceNow or Salesforce.

Your own model – trained on your expertise

We adapt open AI models, for example NVIDIA Nemotron, to your business through fine-tuning: to your technical language, your formats and your workflows. Training runs on your own hardware, and your data stays in-house.

  • The real work: the dataset

    What matters is not the training run but a clean training and test set built from your company data: real examples from quotations, test reports or documentation, cleaned up and checked by your experts. With the test set we measure before and after whether the model really performs better.

  • A lean method

    A method such as LoRA is usually enough: the base model stays unchanged and only a small add-on is trained. That needs far less computing power and GPU memory than full training.

  • What changes does not belong in training

    Prices, regulations or stock levels change all the time. The model looks up such facts in your current documents through document search (RAG) instead of having them trained in.

  • Licence checked for each model

    We only use models whose licence allows commercial use and your own adaptations, and we check this for every model. Examples: NVIDIA Nemotron 3 Super is licensed under the NVIDIA Nemotron Open Model License, Nemotron 3.5 Lightning under OpenMDW 1.1.

We tell you honestly whether fine-tuning is needed or document search is enough.

With your own energy: in practice, training runs can be scheduled, for example for midday hours when your PV system produces more power than the business needs at that moment.

Note: effort and duration depend on the use case and on the quality of your data. We name them once we have seen your data, in writing. StromWert is not a partner of NVIDIA.

How big does it need to be?

Not every AI application needs a container. Three stages, from small to large:

  1. 01

    A server in the office

    One or a few GPU servers for inference and smaller models. Power is usually a few kilowatts; a dedicated circuit and a UPS are enough. The issue here is cooling and waste heat in the room rather than the grid connection.

  2. 02

    GPU racks in an existing building

    Several racks in a server room or hall quickly add up to a few tens of kilowatts of continuous load. We check whether the service connection and main distribution can carry the additional load alongside ongoing operations, and how far PV and storage can reduce the power drawn from the grid.

  3. 03

    A data centre in a container

    A modular container on site, from around 60 kW of continuous load as an example size, and expandable. If the existing connection is not enough, a capacity increase or a separate connection is needed – from a few hundred kilowatts usually at medium voltage with a dedicated transformer substation.

Why your own power: a question of economics

A data centre draws an almost constant load around the clock. That makes it an ideal consumer for PV: as long as the rooftop output stays below the continuous load, every kilowatt-hour is used on site, with no feed-in and independent of exchange prices. If the PV system is larger, a battery shifts the midday surplus into the evening and night. The rest of the demand, above all at night and in winter, is still met by the grid.

  • Your own solar power – usually costs less than grid electricity over the lifetime of the system, and the data centre uses almost all of it.
  • Capping load peaks – with power metering, the highest quarter-hour sets the capacity charge in the grid fees. The battery absorbs peaks, for example when large compute jobs start.
  • Securing the supply – battery, UPS and, if required, a backup generator bridge grid faults if they are designed for it.

Order of magnitude, not an offer

60 kW × 8,760 h ≈ 525 MWh
annual electricity demand at 60 kW of continuous load.
60 kWp ≈ 55–60 MWh
typical annual yield of a PV system of this size in Germany. Almost all of it is self-consumed, but it covers only about a tenth of the demand.
Remainder ≈ 465 MWh
still comes from the grid. That is why the grid connection comes first, not the roof.

Note: yield and share of demand covered are experience values and depend on location, roof area and orientation. A battery does not replace a UPS or a backup power system unless it is designed for that purpose.

Policy tailwind and framework

The German government’s data centre strategy

On 18 March 2026 the German government adopted its data centre strategy. The aim is to at least double data centre capacity in Germany by 2030 and to at least quadruple the connected load for high-performance computing and AI. Source: German Federal Government, data centre strategy (in German).

Energy Efficiency Act: applies to larger data centres

Obligations such as a limit on energy efficiency (PUE) and covering consumption on balance with electricity from renewable sources apply under the German Energy Efficiency Act (EnEfG) to data centres with a non-redundant rated connection capacity of 300 kW or more. The government’s draft bill of June 2026 provides for a threshold of 500 kW of installed IT capacity and postpones the 100 % renewable electricity requirement to 2030; the Bundestag has not yet decided on it. A container data centre at a mid-sized company is often below these thresholds. The main case for your own PV is therefore economic.

Start early: the grid connection sets the schedule

In practice, a container data centre can often be delivered faster than the power to run it. A capacity confirmation, a connection upgrade or a new medium-voltage connection takes many months with the network operator, and longer if a new transformer substation or grid reinforcement is needed; transformers and switchgear have long delivery times of their own. That is why we settle the connection question before any hardware is ordered.

A shortcut: sites with an existing medium-voltage connection

Solar and wind farms already have a medium-voltage substation at the point of connection. Placing a container there can save a lot of time. It is not automatic, though: the farm’s connection is designed for feed-in; drawing power has to be applied for and confirmed by the network operator, the metering concept and the contracts with the direct marketer and network operator have to be adapted, and when it is dark or the wind drops the power still comes from the grid. We check this for the specific site.

Experience from substations and offshore grid connections

Our Managing Director comes from commissioning: more than 20 years in wind energy onshore and offshore, at 66 kV and 220 kV substations, and most recently for 50Hertz Offshore GmbH in quality assurance of the secondary systems of an offshore grid connection. We bring this way of working to every project: test, document, and only then energise.

Switching authorisation for medium-voltage installations, with assignments in Germany and abroad; switching is always carried out within the plant operator’s own authorisation framework.

View references

Manufacturer partners

For data centres we use components from established manufacturers. We only list a partnership here once the manufacturer has confirmed it.

Vertiv Silver Partner badge

Vertiv Partner (Silver)

Since October 2026, StromWert has been a member of the Vertiv Partner Program at Silver level as a Solutions Provider.

Frequently asked questions

From what size is a container data centre an option?

As an example size we quote around 60 kW of IT load. Smaller applications often run on individual GPU servers or racks in an existing building. What suits you depends on your AI applications, data volumes and expansion plans; we clarify this in the site check.

Does StromWert also supply the container and the servers?

That depends on the project. You can buy or lease the container and GPU servers directly from the manufacturer; leasing or financing is often possible through the hardware manufacturers’ own financing offers. We are happy to discuss how we set up procurement. We are manufacturer-neutral and in any case take care of power, grid connection, electrical integration and the coordination of all trades.

Are you tied to particular manufacturers?

Manufacturer-neutral: we are not tied to any server or container manufacturer and recommend the solution that suits your site.

Does the data centre have to run on 100 % renewable electricity?

For most data centres at mid-sized companies, not today. The obligations of the Energy Efficiency Act, including covering consumption on balance with renewable electricity, apply to larger data centres, currently from 300 kW of non-redundant rated connection capacity; an amendment is going through the legislative process. The main case for your own PV is that self-generated power is usually cheaper than grid electricity.

Does the PV system cover the data centre’s electricity demand?

Only part of it. A data centre with 60 kW of continuous load needs around 525 MWh a year; a 60 kWp PV system typically supplies 55 to 60 MWh. The rest still comes from the grid, above all at night and in winter. Your own solar power lowers costs but does not make you independent of the grid.

Is our existing grid connection sufficient?

We check this using your load profile and your connection capacity. A data centre draws an almost constant load around the clock; together with ongoing operations, the service connection often becomes tight. A battery absorbs peaks but does not replace missing continuous capacity.

How quickly is a container data centre up and running?

Setting it up on site is quick: a prefabricated container data centre arrives fully wired and tested and is set up and connected. For its DSX POD reference design, intended for large AI data centres, NVIDIA states as little as 14 days instead of six months at a prepared site. In practice, though, the timeline is usually set by the grid connection: a capacity increase or a new medium-voltage connection takes many months with the network operator, and longer with a new transformer substation. That is why we prepare the site before the hardware is ordered.

How is the data centre connected to our existing systems?

Specialist IT partners or your own team handle IT commissioning, including the connection to existing systems such as your ERP. We coordinate dates and interfaces so that power, grid and IT are ready at the same time.

Which software do you use for AI agents?

NVIDIA OpenShell, an open-source runtime environment (Apache 2.0) with a sandbox and policies per agent, usable with any agent. We decide with you which agent to use, based on the use case. StromWert is not a partner of NVIDIA.

Are AI agents on your own premises secure?

With the right runtime, what an agent can do can be limited in a traceable way. With NVIDIA OpenShell, according to NVIDIA, each agent works in its own isolated environment, can only reach approved destinations, never sees real credentials and, by default, only gets new rights after a person has reviewed the request. This complements your IT security concept; it does not replace it.

Can an AI model be trained on your own expertise?

Yes. An open model such as NVIDIA Nemotron can be adapted through fine-tuning to the technical language, formats and workflows of your business, on your own hardware. The real work is a clean training and test set built from your company data. We tell you honestly whether it pays off or document search is enough.

What is the difference between fine-tuning and document search (RAG)?

Fine-tuning teaches a model how to work: technical terms, the structure of a test report, the tone of a quotation. Document search (RAG) hands it the relevant current documents with every request. Facts that change, such as prices, regulations or stock levels, belong in document search, not in training. A combination often works best.

Can NVIDIA Nemotron be used commercially and fine-tuned?

For the models we name, yes: NVIDIA Nemotron 3 Super is licensed under the NVIDIA Nemotron Open Model License, which allows commercial use and your own derivative works; Nemotron 3.5 Lightning under the open licence OpenMDW 1.1. We check the licence terms, such as notices when passing models on, for every model before we start.

What do I need for my own AI server?

Besides the server itself: an adequately protected circuit, a UPS, cooling for the waste heat and a location with network access. According to manufacturers, a server with eight GPUs draws 10 to 15 kW and needs several power supplies at 200 to 240 V; from several servers or racks, the grid connection becomes an issue.

What is on-premise infrastructure for AI?

AI models run on your own hardware on your own premises instead of in a cloud. This includes GPU servers, storage and networking, but also power supply, UPS, cooling and grid connection. Manufacturers and IT partners handle the IT part; we handle energy and connection.

How much power does an AI server need?

A single workstation a few hundred watts to 1.6 kW, a server with eight current-generation GPUs 10.2 to about 14.3 kW according to NVIDIA, a GB200 NVL72-class rack around 120 kW. At full load around the clock, a 14 kW server needs a good 120 MWh a year, excluding cooling.

What does an on-premise data centre cost?

That depends on computing power, site, grid connection and energy concept. We only give figures once we know your site and your requirements, and then in writing.

Read more

More on grid connections for larger data centres, up to high voltage: AI Data Centre Power. Power draw of GPU servers and racks: AI server power supply, protection: UPS and backup power. Storage and PV in detail: Battery storage, Peak shaving, Commercial and industrial PV. Report: GTC Berlin: inside a modular data centre

Planning AI on your own premises? Let’s talk for 15 minutes about site, capacity and grid connection.